Cross Elementary School

The Cross Elementary School project in Imperial, CA consisted of 6 new wood framed buildings and a roof structure on the seventh building for a total footprint over 60,000 square feet. This was a multi-prime contract with Erickson-Hall Construction Co. as the Construction Manager. All of the buildings utilized Redbuilt’s open web pin connected truss system. This project was completed during the summer months in the Imperial Valley, where the average temperature was above 110°F.

PROJECT DETAILS


Owner: Imperial Unified School District


Construction Manager: Erickson-Hall

                                                 Construction Co.


Location: Imperial, CA


Completion Date: 2018


Scope Of Work: Rough Carpentry