The High Desert Fleet Services Center in Victorville was a 24,000 square foot ground up wood framed and masonry building with a hybrid roof structure.
Core Contracting was hired for all of the wood framing and hybrid panelized roof structure work. The roof structure included fabricating and erecting a 2-piece 110’ long steel girder that was 8’ tall and weighed over 12,000 pounds.